Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This RFP is for the rehabilitation, partial reconstruction, and extension of Runway 9-27 at DeFuniak Springs Municipal Airport, including airfield perimeter fence relocation, roadway realignment, tree clearing, asphalt paving, markings, and electrical improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This Request for Proposals is for the construction and installation of a FAA Runway Status Light (RWSL) System on Runway 9/27 at Memphis International Airport (MEM).
Posted Date
Jan 20, 2026
Due Date
Feb 26, 2026
Release: Jan 20, 2026
Close: Feb 26, 2026
This Request for Proposals is for the construction and installation of a FAA Runway Status Light (RWSL) System on Runway 9/27 at Memphis International Airport (MEM).
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide removal and replacement of PAPI's and cables for runway 9-27 at the union county regional airport. 1 LS mobilization; 1 LS maintenance of traffic; 8,000 LF install #8 AWG thwn-2, 600v, wire; 4,000 LF install #6 AWG, solid, bare copper counterpoise including ground rods and connections/terminations; 3,400 LF install 1-2" sch. 40 PVC duct, direct earth buried; 525 LF install 1-2" sch. 40 HDPE duct, directionally bored; 8 EA install l-867b junction box, complete; 2 ea remove l-880 papi system from existing bases, complete; 2 EA install l-880 led PAPI system, complete; 1 AL subsurface utility engineering (sue) (allowance).
Posted Date
Jan 12, 2026
Due Date
Feb 6, 2026
Release: Jan 12, 2026
Close: Feb 6, 2026
Provide removal and replacement of PAPI's and cables for runway 9-27 at the union county regional airport. 1 LS mobilization; 1 LS maintenance of traffic; 8,000 LF install #8 AWG thwn-2, 600v, wire; 4,000 LF install #6 AWG, solid, bare copper counterpoise including ground rods and connections/terminations; 3,400 LF install 1-2" sch. 40 PVC duct, direct earth buried; 525 LF install 1-2" sch. 40 HDPE duct, directionally bored; 8 EA install l-867b junction box, complete; 2 ea remove l-880 papi system from existing bases, complete; 2 EA install l-880 led PAPI system, complete; 1 AL subsurface utility engineering (sue) (allowance).
AvailableThe Jacksonville Aviation Authority is soliciting competitive bids for the rehabilitation and extension of Taxiway F and the rehabilitation of the Runway 14-32 blast pad at Jacksonville International Airport. The project includes narrowing Taxiway F, extending it into undeveloped areas, and performing asphalt milling and overlay with related subbase rework and turf regrading. Bids are due by February 24, 2026, and a non-mandatory pre-bid conference is scheduled for February 3, 2026.
Posted Date
Jan 22, 2026
Due Date
Feb 24, 2026
Release: Jan 22, 2026
Close: Feb 24, 2026
The Jacksonville Aviation Authority is soliciting competitive bids for the rehabilitation and extension of Taxiway F and the rehabilitation of the Runway 14-32 blast pad at Jacksonville International Airport. The project includes narrowing Taxiway F, extending it into undeveloped areas, and performing asphalt milling and overlay with related subbase rework and turf regrading. Bids are due by February 24, 2026, and a non-mandatory pre-bid conference is scheduled for February 3, 2026.
AvailableProvide rehabilitate runway 5-23.
Posted Date
Jan 27, 2026
Due Date
Feb 25, 2026
Release: Jan 27, 2026
Close: Feb 25, 2026
Provide rehabilitate runway 5-23.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →