Retrieving RFP details
Release
Close
Borough of Wallington
Roadway improvements.
Township of Pennsauken
Project work includes roadway improvements to the various mentioned roadways in the township.
City of Hackensack
Construction of new corner curb extensions, selective reconstruction of concrete sidewalks, ADA curb ramp construction, relocation and installation of signage, drainage improvements, pavement restriping, and selective milling and paving at the intersection.
Borough of Tenafly
Works include approx. 4,453 SY 3" or less HMA milling; 308 LF of 9" x 18" concrete vertical curb; 2,258 LF of 4" traffic Stripes; 62 SY 4" thick concrete sidewalk; 1 Unit reset manhole, sanitary sewer, using existing casting. See outside link.
Release
Sep 28, 2025
Close
Oct 30, 2025