Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Citrus Heights
The City of Citrus Heights is soliciting sealed bids for the Roseville Road and Butternut Drive Intersection & Systematic Signalized Intersection Improvements project, including installation and upgrade of traffic signals, pedestrian safety measures, resurfacing, and associated electrical work. Bidders must obtain contract documents via the city planroom or BPX Printing and comply with submission requirements; the posting is listed as open and is not a grant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Citrus Heights
The City of Citrus Heights is soliciting sealed bids for the Roseville Road and Butternut Drive Intersection & Systematic Signalized Intersection Improvements project, including installation and upgrade of traffic signals, pedestrian safety measures, resurfacing, and associated electrical work. Bidders must obtain contract documents via the city planroom or BPX Printing and comply with submission requirements; the posting is listed as open and is not a grant.
Posted Date
Nov 19, 2025
Due Date
Dec 19, 2025
Release: Nov 19, 2025
City of Citrus Heights
Close: Dec 19, 2025
The City of Citrus Heights is soliciting sealed bids for the Roseville Road and Butternut Drive Intersection & Systematic Signalized Intersection Improvements project, including installation and upgrade of traffic signals, pedestrian safety measures, resurfacing, and associated electrical work. Bidders must obtain contract documents via the city planroom or BPX Printing and comply with submission requirements; the posting is listed as open and is not a grant.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Wake Forest
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Town of Wake Forest
Close: Dec 17, 2025
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
AvailableCity of Alma
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
Posted Date
Nov 22, 2025
Due Date
Dec 17, 2025
Release: Nov 22, 2025
City of Alma
Close: Dec 17, 2025
The reconstruction consist of approx 378 LF of Canterbury Drive at its intersection with U.S. Highway 71 and the replacement of an existing storm drain system 580 FT in length along Canterbury Drive from Rudy Road to Kingswood Drive. The items of work include 90 TONS of asphalt concrete overlay; 172 SY of 7" concrete paving; 186 LF of 24"x38" reinforced concrete elliptical storm drain; 423 LF of 3'-6" wide by 1'-6" deep concrete vertical wall channel; 222 LF of 14"x23" reinforced concrete elliptical storm drain, drainage inlets and headwalls, concrete driveway replacement, ditch regrading and other related items.
AvailableSumter Soil And Water Conservation District
Work includes intersection improvements.
Posted Date
Nov 19, 2025
Due Date
Dec 17, 2025
Release: Nov 19, 2025
Sumter Soil And Water Conservation District
Close: Dec 17, 2025
Work includes intersection improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →