Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes roof top unit replacement of nine rtus and, will require disconnecting and reconnection of direct digital control interface to existing units.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rooftop unit replacement & energy controls upgrades.
Posted Date
Jan 4, 2026
Due Date
Jan 27, 2026
Release: Jan 4, 2026
Close: Jan 27, 2026
Rooftop unit replacement & energy controls upgrades.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement or repair of the rooftop AC and Heating unit at the Police Department Annex, including furnishing and installing a new 4-ton rooftop unit (model # 48FEEA05A2A5-0A0A0) and associated ductwork.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Replacement or repair of the rooftop AC and Heating unit at the Police Department Annex, including furnishing and installing a new 4-ton rooftop unit (model # 48FEEA05A2A5-0A0A0) and associated ductwork.
AvailableThe project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
Posted Date
Dec 29, 2025
Due Date
Feb 10, 2026
Release: Dec 29, 2025
Close: Feb 10, 2026
The project consists of: removal and replacement of rooftop HVAC equipment at Oster elementary school.
AvailableCarrollton Public Schools (MI) seeks proposals to remove and replace the rooftop unit (RTU) serving the middle school gym. The selected contractor must handle removal/disposal of the existing RTU and furnish and install a new RTU with all required labor, materials, permits, protections, engineering, testing, commissioning, and balancing. The opportunity includes a pre-bid meeting and is currently open with a close date of 2026-02-04.
Posted Date
Jan 14, 2026
Due Date
Feb 4, 2026
Release: Jan 14, 2026
Close: Feb 4, 2026
Carrollton Public Schools (MI) seeks proposals to remove and replace the rooftop unit (RTU) serving the middle school gym. The selected contractor must handle removal/disposal of the existing RTU and furnish and install a new RTU with all required labor, materials, permits, protections, engineering, testing, commissioning, and balancing. The opportunity includes a pre-bid meeting and is currently open with a close date of 2026-02-04.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →