Summary
Roof & siding replacement - metal storage building cataldo forest protection district. Project shall include the demolition, removal and disposal of existing metal roofing, siding, and associated trim on 125 x 30 metal building. The existing siding, roof, and trim will be replaced with 24-gauge glacier white purlin bearing rib (pbr) roofing, ivory colored 26-gauge high tensile steel siding, associated trim to include ridge cap, drip cap, corner caps, beam and door wraps. Additionally, vendor will install 2 insulation blanket on enclosed portion of the building (approx. 50 x30 exterior dimension), approx. 50 of rain gutters, 4 downspouts, 100 of snow breaks as directed by the cor, and an owner provided exterior light (owner provided exterior light will replace existing exterior light). Roof and siding fasteners must be #14 minimum size.