Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Ralston High School
Provide roof restoration services. The scope will include the removal of all demolished materials, installation of new tapered insulation and cover board, all flashing, boots, pitch pans and metal trim to match the existing trim and as further described in the project specifications and project documents which may be obtained at the pre-bid conference.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Ralston High School
Provide roof restoration services. The scope will include the removal of all demolished materials, installation of new tapered insulation and cover board, all flashing, boots, pitch pans and metal trim to match the existing trim and as further described in the project specifications and project documents which may be obtained at the pre-bid conference.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Ralston High School
Close: Jan 8, 2026
Provide roof restoration services. The scope will include the removal of all demolished materials, installation of new tapered insulation and cover board, all flashing, boots, pitch pans and metal trim to match the existing trim and as further described in the project specifications and project documents which may be obtained at the pre-bid conference.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bergen Community College
Library wing roof replacement. The scope of work includes the replacement of the existing roof system at Ender Hall as indicated on the contract drawings.
Posted Date
Dec 8, 2025
Due Date
Jan 21, 2026
Release: Dec 8, 2025
Bergen Community College
Close: Jan 21, 2026
Library wing roof replacement. The scope of work includes the replacement of the existing roof system at Ender Hall as indicated on the contract drawings.
AvailableMurrieta Valley Unified School District
Work includes Roof Replacement at school.
Posted Date
Nov 17, 2025
Due Date
Dec 15, 2025
Release: Nov 17, 2025
Murrieta Valley Unified School District
Close: Dec 15, 2025
Work includes Roof Replacement at school.
AvailableCity of Holyoke
Prequalify roofer prime contractors for the Roof Replacement to the Holyoke High School.
Posted Date
Oct 22, 2025
Due Date
Dec 15, 2025
Release: Oct 22, 2025
City of Holyoke
Close: Dec 15, 2025
Prequalify roofer prime contractors for the Roof Replacement to the Holyoke High School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →