Summary
Work includes but is not limited to: 1. Good faith asbestos inspection(s) testing to comply with rcw 49. 26. 013 as required to achieve scope of work. 2. Removal and replacement of all existing roofing materials and 20 sheets of plywood deck sheathing as well as 400lf of fascia board. 3. Inspect all exposed roof framing for any rot or damaged materials and repair as needed. 4. Block and seal any existing gable vents from attic interior. 5. Provide and install new ½” cdx plywood deck sheathing and roofing materials according to manufacturer’s recommended installation specifications. 6. Provide and install all new approved roofing system components: a. Install approved ice and water shield roof underlayment to all critical areas and valleys. B. Install approved synthetic roof underlayment. C. Install approved composition roofing system. 7. Install metal roof vent with minimum 50 sq. In net free area ventilation. Total free area of ventilation must meet code requirements for attic ventilation. 8. Install cor-a-vent in-vent attic roof vent or approved equal. Block eave vents after installation. 9. Install all metal 24-gauge flashing components according to manufacturer’s recommendations including roof penetration flashing, roof to wall flashing, eave and rake flashings and w-valley flashing. 10. Install permanent fall arrest/restraint roof anchors and all other accessory items to complete the installation and maintenance of the roof in a safe and secure manner. 11. Install new fascia boards where there is any decay or rot that would prevent the exterior paint to be applied and warranted. Include painting of all fascia prior to installation of new gutters. (see section 1. 5 unit costs for details. ) 12. Install new 5” k-style aluminum gutters and 2”x3” aluminum downspouts to match existing locations. 13. Haul away and dispose of all debris and demolished materials. 14. Include painting all b-vent flashings, roof accessories and lead pipe flashings as needed. 15. Daily cleaning and final cleaning of all trash and debris. 16. Prevailing wage rates to be included. 17. Acceptable roofing products must meet these warranty requirements: contractor’s workmanship warranty for a period of two (2) years from final completion. Subcontractor’s labor and materials for a period of two (2) years from final completion. Roofing manufacturer’s warranty of 100% materials and labor for five (5) years without proration or reductions. Roofing manufacturer’s 40-year warranty for materials.