Summary
Provide roof repairs at seven (7) of city facilities. Remove debris from existing roof. Install pitch break metal between patio and comp shingles. Install foam closure as needed. Clean up and haul away all debris. Mechanically fasten 1/2 hdfr board for class "a" fire rating. Mechanically fasten 60 mil tpo membrane roof system over entire roof, heat welding all seams. Install new drain. Install new coping metal. Remove existing comp. Shingles (1 layer), clean up and haul away debris. Replace (20 ft.) of damaged facia. Replace (10) sheets of damaged plywood. Underlayment: nail down 1 layer of diamond deck synthetic paper. See outside link.