Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roofing renewal of Buildings 1, 2, and 4 includes: Remove existing low-slope roof assembly down to the structural deck; install an adhered roof assembly with air barrier, vapor, retarder, code-compliant tapered insulation, rigid coverboard, and modified bitumen membrane roof; manage water internally with new drains integrated into existing plumbing; apply cold fluid liquid flashings at critical transitions, details, and penetrations; construct framed parapets; add overflow drains, including discharge penetrations at the exterior walls and overflow rainwater leaders in the interstitial ceiling space at the upper floor; waterproof exposed concrete and integrate into lower roof; install new skylight at the low roof zone.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
Posted Date
Jan 14, 2026
Due Date
Feb 5, 2026
Release: Jan 14, 2026
Close: Feb 5, 2026
Work consists of approx. the removal and replacement of campus center roof and skylights; see outside link for more details.
AvailableRe-roof project.
Posted Date
Jan 1, 2026
Due Date
Jan 28, 2026
Release: Jan 1, 2026
Close: Jan 28, 2026
Re-roof project.
AvailableProvide Senior Center Roof Replacement Project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Provide Senior Center Roof Replacement Project.
AvailableBD2627 Hilltop Service Building and Mosaic Community Campus Wildcat Roof
Posted Date
Dec 17, 2025
Due Date
Jan 28, 2026
Release: Dec 17, 2025
Close: Jan 28, 2026
BD2627 Hilltop Service Building and Mosaic Community Campus Wildcat Roof
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis