Summary
The work consists of removing old roof and placing a new roof. A) Removal of existing roof system down to the substrate and inspect condition. B) Replace any non-suitable roof substrate with OSB 7/16 Application as 4 ft. X 8 ft. Sheathing Panel Board C) Install a moisture barrier between roof and the substrate. D) Install new cedar shake medium hand split CCA treated roof. E) Deck the Building to insure proper installation of new shake roof. F) Dispose of removed roof materials off site and clean any debris on the ground from demolitions. (2) Materials and Requirements: 1/2”- 3/4” Cedar Shake Medium Hand Split 5/8” - Cedar Hip 3/4” x 18” Cedar Starter 1 -1/2” SS Ring Shank Nail Large Head Tarco ASTM D226 30 Pound Felt (Moisture Barrier) 39 Sheets of OSB (7/16, 4’x8’) Decking & Nails 5 Year Workmanship Warranty.