Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of porous pavement, 4" asphalt pavement over 8" dense graded base course, curb and gutter replacement, miscellaneous concrete sidewalk, concrete driveway approaches, storm sewer and storm catch basin and manhole replacement, light poles, electrical conduit, landscaping, playground equipment installations, rain garden installations and all incidental items necessary to complete the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide services to replace playground surfacing. Work includes: demolition & disposal of existing surface, any associated site work in preparation of new surface, and installation of a poured-in-place rubber surfacing with thickness that is appropriate for the usage of the existing play structures on site. Approx. 6,800 SF.
Posted Date
Dec 4, 2025
Due Date
Dec 17, 2025
Release: Dec 4, 2025
Close: Dec 17, 2025
Provide services to replace playground surfacing. Work includes: demolition & disposal of existing surface, any associated site work in preparation of new surface, and installation of a poured-in-place rubber surfacing with thickness that is appropriate for the usage of the existing play structures on site. Approx. 6,800 SF.
Premium
Access the largest public sector contact database
Track surface replacement. Removal of existing track and jumping event 1 rubberized surface and finish lift of asphalt for the track, d areas, and long/triple jump runways, 2 reconstruction of the pole vault runway and landing areas in concrete, new rubberized track surfacing for 3 all track running and jumping events, and site restoration of all disturbed areas during construction.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Close: Jan 8, 2026
Track surface replacement. Removal of existing track and jumping event 1 rubberized surface and finish lift of asphalt for the track, d areas, and long/triple jump runways, 2 reconstruction of the pole vault runway and landing areas in concrete, new rubberized track surfacing for 3 all track running and jumping events, and site restoration of all disturbed areas during construction.
AvailableWork includes site preparation and grading; concrete work; assembly and anchoring of the play structure, installation of shade structures, including all required footings and supports; and construction of a sandbox with appropriate drainage and containment. Improvements to the additional play area are the removal and disposal of play equipment and footings, including the removal of the soft fall material, playground mat, and existing borders. Installation of new play equipment and reconstruction of the play structure area.
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
Work includes site preparation and grading; concrete work; assembly and anchoring of the play structure, installation of shade structures, including all required footings and supports; and construction of a sandbox with appropriate drainage and containment. Improvements to the additional play area are the removal and disposal of play equipment and footings, including the removal of the soft fall material, playground mat, and existing borders. Installation of new play equipment and reconstruction of the play structure area.
AvailablePark awning replacement.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Close: Dec 16, 2025
Park awning replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis