Summary
1.Removal of existing lift station equipment and piping at lift station no. 3. The project includes the removal of the existing precast wet well and valve vault lids and top portions. 2.Install pumps, piping, fitting, valves, and all appurtenances for the new station. 3.Furnish and install new controls and generator as noted in the contract documents. 4.Site work including the removal and installation of a new bituminous driveway, site grading, installation of new concrete pad. together with numerous related items of work, all in accordance with plans and specifications. This project is subject to prevailing wage rates, truck rentals, disadvantaged business enterprise goals, targeted group business program goals, and veteran-owned small business, equal employment opportunity provisions.