Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 740 LF of 8" DI water main; 500 LB for additional fittings; 1 EA of hydrant; 8 EA of 8" gate valve; 16 EA of 1" corporation stop; 1 EA of Precast concrete sanitary sewer manhole with frame and cover;3 EA of Precast concrete catch basin with frame and grate; 20 LF of Removal and disposal of asbestos cement pipe;570 LF of 8" cured-in-place pipe lining;15 EA of Service connection rehabilitation, per each grout service connection;31 VF of Cementitious lining of manholes;40 LF of 12"PVC drain pipe; 40 CY of Rock excavation and disposal; 450 SY of Loaming and seeding;270 SF of Cement concrete sidewalk;320 SY of Milling; 5 EA of Reconstruction of existing sewers or drains; 9 EA of Inlet protection; 3,600 LB of Calcium chloride for dust control;
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of construction services for the Walnut Street Improvement Project.
Posted Date
Nov 24, 2025
Due Date
Dec 29, 2025
Release: Nov 24, 2025
Close: Dec 29, 2025
Procurement of construction services for the Walnut Street Improvement Project.
AvailableSealed bids sought for Walnut Street roadway improvement construction — full general construction services (labor, materials, traffic control, underground utility verification, ADA compliance, site restoration). Key requirements: mandatory pre-bid attendance, 5% bid bond, 100% performance and payment bonds, specified insurance limits and additional insureds, 135-calendar-day completion from notice to proceed, and quarterly subcontractor/supplier reporting. MW/DBE participation encouraged.
Posted Date
Nov 24, 2025
Due Date
Dec 29, 2026
Release: Nov 24, 2025
Close: Dec 29, 2026
Sealed bids sought for Walnut Street roadway improvement construction — full general construction services (labor, materials, traffic control, underground utility verification, ADA compliance, site restoration). Key requirements: mandatory pre-bid attendance, 5% bid bond, 100% performance and payment bonds, specified insurance limits and additional insureds, 135-calendar-day completion from notice to proceed, and quarterly subcontractor/supplier reporting. MW/DBE participation encouraged.
AvailablePerform pre-construction and construction services for the powell street improvement project.
Posted Date
Nov 3, 2025
Due Date
Dec 19, 2025
Release: Nov 3, 2025
Close: Dec 19, 2025
Perform pre-construction and construction services for the powell street improvement project.
AvailablePhase I: Construction of a parking lot containing approximately 350 parking spaces. The parking lot will include sidewalks both within the parking lot and around the exterior of the parking lot, a dedicated bike lane through the parking lot, retention ponds, lighting and landscaping. Phase II: The demolition and replacement of street. The new construction will include a dedicated two-lane bike lane so bike traffic can enter and exit the Park. The construction of new sidewalks, including a sidewalk under the trestle going to MLK. The new construction will align with the parking lot and include lighting and landscaping.
Posted Date
Nov 24, 2025
Due Date
Dec 29, 2025
Release: Nov 24, 2025
Close: Dec 29, 2025
Phase I: Construction of a parking lot containing approximately 350 parking spaces. The parking lot will include sidewalks both within the parking lot and around the exterior of the parking lot, a dedicated bike lane through the parking lot, retention ponds, lighting and landscaping. Phase II: The demolition and replacement of street. The new construction will include a dedicated two-lane bike lane so bike traffic can enter and exit the Park. The construction of new sidewalks, including a sidewalk under the trestle going to MLK. The new construction will align with the parking lot and include lighting and landscaping.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis