Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Macon-Bibb County
Phase I: Construction of a parking lot containing approximately 350 parking spaces. The parking lot will include sidewalks both within the parking lot and around the exterior of the parking lot, a dedicated bike lane through the parking lot, retention ponds, lighting and landscaping. Phase II: The demolition and replacement of street. The new construction will include a dedicated two-lane bike lane so bike traffic can enter and exit the Park. The construction of new sidewalks, including a sidewalk under the trestle going to MLK. The new construction will align with the parking lot and include lighting and landscaping.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Glynn County
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
Glynn County
Close: Dec 5, 2025
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
AvailableCity of Los Alamitos
Grind and overlay one residential street within the City as part of the City’s ongoing pavement management program. The project will also replace damaged curb & gutter and lifted sidewalk to correct drainage. ADA curb ramps will be modified to current.
Posted Date
Nov 18, 2025
Due Date
Dec 11, 2025
Release: Nov 18, 2025
City of Los Alamitos
Close: Dec 11, 2025
Grind and overlay one residential street within the City as part of the City’s ongoing pavement management program. The project will also replace damaged curb & gutter and lifted sidewalk to correct drainage. ADA curb ramps will be modified to current.
AvailableCity of Nashua
The City of Nashua Division of Public Works seeks bids for construction to improve traffic flow and safety at the Walnut Street Oval intersection, including minor intersection modifications, pavement marking and signage revisions, and traffic signal modifications. The solicitation requires NHDOT pre-qualification, bonds and insurance, cites substantial completion by 2026-08-14 and final completion by 2026-09-30, and has a bid due date of 2026-01-08.
Posted Date
Nov 20, 2025
Due Date
Jan 8, 2026
Release: Nov 20, 2025
City of Nashua
Close: Jan 8, 2026
The City of Nashua Division of Public Works seeks bids for construction to improve traffic flow and safety at the Walnut Street Oval intersection, including minor intersection modifications, pavement marking and signage revisions, and traffic signal modifications. The solicitation requires NHDOT pre-qualification, bonds and insurance, cites substantial completion by 2026-08-14 and final completion by 2026-09-30, and has a bid due date of 2026-01-08.
AvailableCity of Fairview Park
Project consists of water main improvement.
Posted Date
Jun 27, 2025
Due Date
Dec 12, 2025
Release: Jun 27, 2025
City of Fairview Park
Close: Dec 12, 2025
Project consists of water main improvement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →