Summary
Work includes clearing and grubbing, removal of old box culvert, station 18+82.15, 50 SY removing concrete sidewalk, 92 SY removing concrete driveway, 41 SY removing concrete steps, 1,402 LF removing curb and gutter, removing inlets (partial), 3,162 CY unclassified excavation, 10,048 CY borrow excavation (loose truckbed measurement), 1,915 Ton borrow excavation (underwater embankment), 762 CY structure excavation, 441 CY foundation backfill, commercial, 324 SY geosynthetic reinforcement for soft soil stabilization, type 2, 10 CY cement mortar flowable backfill, mix 1, 3,613 SY crushed aggregate base course, type b, plant mixed, 6" compacted thickness. See attached file.