Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Roadway Improvements for the paving of approx 0.73 miles of existing dirt road.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes 54 EA inlet protection system; 1 LS clearing and grubbing; 8731.3 CY regular excavation; 143. 7 CY embankment; 18,967 CY type b stabilization; 980 SY optional base, base group 04; 15,380 SY optional base, base group 06; 1,746 TN superpave asphaltic concrete, traffic c, pg76-22; 846 tn asphalt concrete friction course,traffic c, fc-9. 5, pg 76-22; 22 EA inlets, curb, type 9; 22 eainlets, dt bot, type c,<10'; 8 eainlets, dt bot, type f,<10'; 22 EA manholes, p-7, <10'; 19 EA manhole, adjust, utilities; 18 EA valve boxes, adjust; 3 EA meter boxes, adjust; 1,528 LF pipe culvert,optional material,round, 18"s/cd. See outside link.
Posted Date
Nov 30, 2025
Due Date
Jan 15, 2026
Release: Nov 30, 2025
Close:
Premium
Access the largest public sector contact database
Work includes 54 EA inlet protection system; 1 LS clearing and grubbing; 8731.3 CY regular excavation; 143. 7 CY embankment; 18,967 CY type b stabilization; 980 SY optional base, base group 04; 15,380 SY optional base, base group 06; 1,746 TN superpave asphaltic concrete, traffic c, pg76-22; 846 tn asphalt concrete friction course,traffic c, fc-9. 5, pg 76-22; 22 EA inlets, curb, type 9; 22 eainlets, dt bot, type c,<10'; 8 eainlets, dt bot, type f,<10'; 22 EA manholes, p-7, <10'; 19 EA manhole, adjust, utilities; 18 EA valve boxes, adjust; 3 EA meter boxes, adjust; 1,528 LF pipe culvert,optional material,round, 18"s/cd. See outside link.
AvailableThe City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
The City of Fresno seeks construction services to install a HAWK pedestrian signal at First St & Home Ave and a traffic signal at Chestnut Ave & Weldon Ave, including conduits, pull boxes, conductors, loop detectors, signal poles, controller cabinet, ITS equipment, service pedestal, curb ramps, valley gutter, pavement rehabilitation, signing and striping. The estimated construction allocation is $1,599,650.00 and the work must be completed within 90 working days from the Notice to Proceed. Bidders must hold a valid California Class 'A' or 'C-10' contractor license, provide required bonds (10% bid bond, 100% payment and performance bonds) and comply with federal requirements for federally assisted construction projects.
AvailableProject includes approx 1,307 CY of Roadway Excavation; 5,937 SY of Asphaltic Concrete (3" Thick); 5,638 SY of Asphaltic Concrete (1.5" Thick) (Overlay); 5,638 SY of Cold Planing Asphaltic Pavement (1.5"); 392 LF of Concrete Curb (Barrier) (2' Wide); 53 SY of Driveways (6" Thick); 1,135 LF of Sawcutting. See outside link.
Posted Date
Aug 12, 2025
Due Date
Dec 23, 2025
Release: Aug 12, 2025
Close: Dec 23, 2025
Project includes approx 1,307 CY of Roadway Excavation; 5,937 SY of Asphaltic Concrete (3" Thick); 5,638 SY of Asphaltic Concrete (1.5" Thick) (Overlay); 5,638 SY of Cold Planing Asphaltic Pavement (1.5"); 392 LF of Concrete Curb (Barrier) (2' Wide); 53 SY of Driveways (6" Thick); 1,135 LF of Sawcutting. See outside link.
AvailableThe project consists of water line replacement (open cut and directional bore), concrete roadway, sidewalk, and driveway removal and replacement.
Posted Date
Dec 17, 2025
Due Date
Jan 27, 2026
Release: Dec 17, 2025
Close: Jan 27, 2026
The project consists of water line replacement (open cut and directional bore), concrete roadway, sidewalk, and driveway removal and replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis