Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Grading, aggregate base, curb & gutter, sidewalks, bituminous surfacing, & aggregate shouldering.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
Close: Dec 12, 2025
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Premium
Access the largest public sector contact database
Provide road maintenance work. Preferred equipment needed: grader, backhoe, dump truck, distributor truck, roller, chipper truck and brush cutter. Please provide a list of prices per hour for each machine and labor. Applicants must keep good records. Snow removal required when necessary.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Close: Jan 5, 2026
Provide road maintenance work. Preferred equipment needed: grader, backhoe, dump truck, distributor truck, roller, chipper truck and brush cutter. Please provide a list of prices per hour for each machine and labor. Applicants must keep good records. Snow removal required when necessary.
AvailableCharleston County is soliciting bids for construction of pedestrian improvements along Folly Road and Country Club Drive. The work includes roadway and pedestrian-related construction per the county’s final construction plans and scope of work. Bids must be submitted via the Bonfire portal by the stated close date and time.
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Charleston County is soliciting bids for construction of pedestrian improvements along Folly Road and Country Club Drive. The work includes roadway and pedestrian-related construction per the county’s final construction plans and scope of work. Bids must be submitted via the Bonfire portal by the stated close date and time.
AvailableThe Florida Fish and Wildlife Conservation Commission (FWC) issued an Invitation to Bid (ITB-14567) for roadwork at Babcock Ranch Preserve to supply, deliver, spread, and grade ~9,279 tons of DOT-certified bank run shell base material over ~2.5 miles. Work includes meeting minimum depth, crown requirements, providing DOT material certification, and coordinating with the FWC Project Manager; project completion is required by May 31, 2026. Bidders must be registered in MyFloridaMarketPlace (MFMP) and SunBiz; minority-, woman-, and service-disabled veteran-owned businesses are encouraged to participate.
Posted Date
Dec 9, 2025
Due Date
Jan 10, 2026
Release: Dec 9, 2025
Close: Jan 10, 2026
The Florida Fish and Wildlife Conservation Commission (FWC) issued an Invitation to Bid (ITB-14567) for roadwork at Babcock Ranch Preserve to supply, deliver, spread, and grade ~9,279 tons of DOT-certified bank run shell base material over ~2.5 miles. Work includes meeting minimum depth, crown requirements, providing DOT material certification, and coordinating with the FWC Project Manager; project completion is required by May 31, 2026. Bidders must be registered in MyFloridaMarketPlace (MFMP) and SunBiz; minority-, woman-, and service-disabled veteran-owned businesses are encouraged to participate.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis