Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide road maintenance work. Preferred equipment needed: grader, backhoe, dump truck, distributor truck, roller, chipper truck and brush cutter. Please provide a list of prices per hour for each machine and labor. Applicants must keep good records. Snow removal required when necessary.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
Close: Dec 12, 2025
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Premium
Access the largest public sector contact database
The purpose of this maintenance activity is to improve stormwater drainage and ensure public safety in and around the Stono Edge subdivision by allowing stormwater to drain more efficiently to the river.
Posted Date
Nov 14, 2025
Due Date
Dec 15, 2025
Release: Nov 14, 2025
Close: Dec 15, 2025
The purpose of this maintenance activity is to improve stormwater drainage and ensure public safety in and around the Stono Edge subdivision by allowing stormwater to drain more efficiently to the river.
AvailableJefferson Davis County seeks bids for the construction of 0.261 miles of maintenance work on Old River Road, including mobilization, granular material, polymerized emulsified asphalt, seal aggregate cover material, and traffic maintenance. The project is part of the State Aid Program Project No. SAP-33(25)M.
Posted Date
Nov 12, 2025
Due Date
Dec 15, 2025
Release: Nov 12, 2025
Close: Dec 15, 2025
Jefferson Davis County seeks bids for the construction of 0.261 miles of maintenance work on Old River Road, including mobilization, granular material, polymerized emulsified asphalt, seal aggregate cover material, and traffic maintenance. The project is part of the State Aid Program Project No. SAP-33(25)M.
AvailableRoad maintenance and construction work, 811 -Surface Maintenance (Single Lane Blading, 14’ width, Compaction A, natural moisture), Roadway Drainage System Maintenance, Install Cattleguard (GFM, 14’ width, native surfacing), Install CMP (GFM – 24”), Install Steel Gate (GFM – 14 FT).
Posted Date
Nov 6, 2023
Due Date
Jan 31, 2028
Release: Nov 6, 2023
Close: Jan 31, 2028
Road maintenance and construction work, 811 -Surface Maintenance (Single Lane Blading, 14’ width, Compaction A, natural moisture), Roadway Drainage System Maintenance, Install Cattleguard (GFM, 14’ width, native surfacing), Install CMP (GFM – 24”), Install Steel Gate (GFM – 14 FT).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis