Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Florida Fish and Wildlife Conservation Commission (FWC) issued an Invitation to Bid (ITB-14567) for roadwork at Babcock Ranch Preserve to supply, deliver, spread, and grade ~9,279 tons of DOT-certified bank run shell base material over ~2.5 miles. Work includes meeting minimum depth, crown requirements, providing DOT material certification, and coordinating with the FWC Project Manager; project completion is required by May 31, 2026. Bidders must be registered in MyFloridaMarketPlace (MFMP) and SunBiz; minority-, woman-, and service-disabled veteran-owned businesses are encouraged to participate.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of ground storage tank and repump station at babcock ranch. Division 01 - photo & video; division 01 - surveying; division 02 - milling & paving; division 02 - testing laboratory; division 03 - cast-in-place concrete & reinforcing steel; division 05 - miscellaneous metals; division 09 - painting & protective coatings; division 11 - misc. Equipment; division 11 - pumps; division 13 - prestressed concrete tanks; division 13 - metal bldg; division 13 - precast concrete buildings; division 15 - pipe/valves/fittings; division 16 - electrical; division 16 - fire protection; division 16 - generators; division 17 - instrumentation.
Posted Date
Sep 22, 2025
Due Date
Jan 9, 2026
Release: Sep 22, 2025
Close: Jan 9, 2026
Premium
Access the largest public sector contact database
Project consists of ground storage tank and repump station at babcock ranch. Division 01 - photo & video; division 01 - surveying; division 02 - milling & paving; division 02 - testing laboratory; division 03 - cast-in-place concrete & reinforcing steel; division 05 - miscellaneous metals; division 09 - painting & protective coatings; division 11 - misc. Equipment; division 11 - pumps; division 13 - prestressed concrete tanks; division 13 - metal bldg; division 13 - precast concrete buildings; division 15 - pipe/valves/fittings; division 16 - electrical; division 16 - fire protection; division 16 - generators; division 17 - instrumentation.
Work include site clearing, grading, installation of asphalt drive and parking areas.
Posted Date
Dec 4, 2025
Due Date
Jan 14, 2026
Release: Dec 4, 2025
Close: Jan 14, 2026
Work include site clearing, grading, installation of asphalt drive and parking areas.
AvailableInstallation of approx. 4,090 SY of 5” Concrete Surfacing, 4,500 SY of 4” Crushed Base, 200 LF of 12”CMP Storm Pipe and other miscellaneous work for the Town of Rolling Hills Wyoming.
Posted Date
Dec 1, 2025
Due Date
Dec 18, 2025
Release: Dec 1, 2025
Close: Dec 18, 2025
Installation of approx. 4,090 SY of 5” Concrete Surfacing, 4,500 SY of 4” Crushed Base, 200 LF of 12”CMP Storm Pipe and other miscellaneous work for the Town of Rolling Hills Wyoming.
AvailableWork include bridge deck replacement. The total length of improvement being 0.158 miles.
Posted Date
Dec 4, 2025
Due Date
Dec 12, 2025
Release: Dec 4, 2025
Close: Dec 12, 2025
Work include bridge deck replacement. The total length of improvement being 0.158 miles.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis