Summary
Work includes all road sweeping and reclaimed asphalt disposal. Minimum width of asphalt pavement shall be 22-24'. Tack coatings shall be applied between milled asphalt. All existing road patches will be hand patched again before the shim or shimmed twice where needed. A 1" shim on the whole road with transitioned joints on existing pavement will be grinded to match. The asphalt shall be 9.5 coarse with the surface being 1.5" thick before compaction. Contractor shall cut and or grind all joints where new pavement matches existing pavement at intersections and driveways. All driveways shall be matched to the pavement of not less than 2' of the apron into the driveway whether paved or gravel.