Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes preparation of road right-of-way including grading and removal of any foreign or deleterious material from the limits of paving, preparation of subgrade to plan grade and specifications, installation of base material to plan grade and specifications, placement of asphalt surface course to plan grade and specifications, construction of stabilized shoulders, restoration and fine grading of right-of-way outside of paved areas, sodding of all disturbed areas outside the roadway footprint, installation of temporary and permanent traffic striping. Maintenance of vehicular traffic (ttc/mot), maintenance of pedestrian traffic, erosion control and other incidental work necessary to complete the project. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Intersection improvements. Including 8,170 SY HMA milling, 3" or less; 1,200 ton hot mix asphalt 9.5M64 surface course; 310 ton hot mix asphalt 19M64 base course; 4,050 LF ploymerized joint adhesive; 22 LF of 12" reinforced concrete pipe, CL IV; 201 LF of 15" reinforced concrete pipe, CL IV; 82 LF of 18" reinforced concrete pipe, CL IV; 28 LF of 24" reinforced concrete pipe, CL IV. See attached file.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Intersection improvements. Including 8,170 SY HMA milling, 3" or less; 1,200 ton hot mix asphalt 9.5M64 surface course; 310 ton hot mix asphalt 19M64 base course; 4,050 LF ploymerized joint adhesive; 22 LF of 12" reinforced concrete pipe, CL IV; 201 LF of 15" reinforced concrete pipe, CL IV; 82 LF of 18" reinforced concrete pipe, CL IV; 28 LF of 24" reinforced concrete pipe, CL IV. See attached file.
Bergen County, NJ (BC Purchasing) issued an RFB for intersection improvements at Washington Avenue/Moonachie Road & Moonachie Ave/Empire Blvd (construction/road infrastructure work). The opportunity was posted on the county's Bonfire portal and is open (posting Dec 19, 2025 at 1:00 PM EST) with a submission deadline on Jan 9, 2026 at 12:00 PM EST; questions are due Dec 30, 2025 at 12:00 PM EST. Supporting documents listed on the Bonfire page include bid plans, special provisions, a bid proposal template and the county's construction contract form; downloads require a Bonfire account.
Posted Date
Dec 19, 2025
Due Date
Jan 9, 2026
Release: Dec 19, 2025
Close: Jan 9, 2026
Bergen County, NJ (BC Purchasing) issued an RFB for intersection improvements at Washington Avenue/Moonachie Road & Moonachie Ave/Empire Blvd (construction/road infrastructure work). The opportunity was posted on the county's Bonfire portal and is open (posting Dec 19, 2025 at 1:00 PM EST) with a submission deadline on Jan 9, 2026 at 12:00 PM EST; questions are due Dec 30, 2025 at 12:00 PM EST. Supporting documents listed on the Bonfire page include bid plans, special provisions, a bid proposal template and the county's construction contract form; downloads require a Bonfire account.
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
Construction of pedestrian and traffic signalization, ADA ramps, sidewalks, and striping at Lobdell Ave / Goodwood Blvd and Lobdell Ave / Seven Oaks Ave intersections.
AvailableThe City of Lynnwood seeks a qualified consulting firm to provide civil engineering design and planning services for the 33rd Ave W Ring Road Project to address traffic congestion and improve safety/connectivity in the North Lynnwood (Costco) area. Phase 1 will identify short- and long-term transportation projects and produce short-term bid-ready construction packages; future phases will include PS&E for improvements identified in Phase 1. The anticipated contract term is approximately 24 months and the work will follow WSDOT/AASHTO/ADA standards and include community outreach and environmental/permitting coordination.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
The City of Lynnwood seeks a qualified consulting firm to provide civil engineering design and planning services for the 33rd Ave W Ring Road Project to address traffic congestion and improve safety/connectivity in the North Lynnwood (Costco) area. Phase 1 will identify short- and long-term transportation projects and produce short-term bid-ready construction packages; future phases will include PS&E for improvements identified in Phase 1. The anticipated contract term is approximately 24 months and the work will follow WSDOT/AASHTO/ADA standards and include community outreach and environmental/permitting coordination.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis