Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town/Falls Village Housing Trust is soliciting sealed bids for site construction at 3 River Road to support the River Road Homes development 16 affordable rental units across 5 buildings including clearing, erosion control, fill, grading, underground stormwater, road subgrade and base gravel course, and site stabilization. A pre-bid meeting is scheduled for January 26, 2026 and bidders must contact the listed project contact to obtain plans and contract documents. Bids are due February 12, 2026 at 4:00 PM Eastern; this solicitation is an Invitation for Bid for construction (not a grant).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Falls Village Housing Trust, Inc. (FVHT) is soliciting bids for initial site construction work at 3 River Road in Falls Village, CT to prepare for the construction of 16 affordable housing units across five buildings. The scope includes clearing, erosion control, fill and grading, underground stormwater systems, road subgrade and base gravel course, and site stabilization; the estimated value range is approximately $2,000,000–$5,000,000 (AI estimate). A pre-bid meeting is scheduled for January 26, 2026 at noon and the solicitation indicates bidding opens January 14, 2026 and closes February 12, 2026.
Posted Date
Jan 14, 2026
Due Date
Feb 12, 2026
Release: Jan 14, 2026
Close: Feb 12, 2026
Falls Village Housing Trust, Inc. (FVHT) is soliciting bids for initial site construction work at 3 River Road in Falls Village, CT to prepare for the construction of 16 affordable housing units across five buildings. The scope includes clearing, erosion control, fill and grading, underground stormwater systems, road subgrade and base gravel course, and site stabilization; the estimated value range is approximately $2,000,000–$5,000,000 (AI estimate). A pre-bid meeting is scheduled for January 26, 2026 at noon and the solicitation indicates bidding opens January 14, 2026 and closes February 12, 2026.
AvailableThe project scope includes initial site work for subsequent construction of 16 units of affordable housing in 5 buildings, and includes clearing, erosion control, additional fill, grading, underground stormwater, road subgrade and base gravel course, site stabilization.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
The project scope includes initial site work for subsequent construction of 16 units of affordable housing in 5 buildings, and includes clearing, erosion control, additional fill, grading, underground stormwater, road subgrade and base gravel course, site stabilization.
AvailablePavement preservation project for Wind River Road, involving roadway surveying, excavation, surfacing, hot mix asphalt (HMA) paving, traffic control, drainage adjustments, erosion control, guardrail installation, and signing.
Posted Date
Dec 1, 2025
Due Date
Jan 21, 2026
Release: Dec 1, 2025
Close: Jan 21, 2026
Pavement preservation project for Wind River Road, involving roadway surveying, excavation, surfacing, hot mix asphalt (HMA) paving, traffic control, drainage adjustments, erosion control, guardrail installation, and signing.
AvailablePennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
PennDOT is presenting a virtual plans display for the South River Road (Route 147) bridge rehabilitation over Powells Creek in Reed Township, Dauphin County. The public display and comment period run from January 5, 2026 through February 4, 2026, and the project involves preservation work such as gunite removal, masonry repointing, drains and waterproofing, and roadway/guide rail reconstruction. This is an active PennDOT project information/engagement posting, not a grant or award notice.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis