Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 29, 2026
Release: Dec 15, 2025
Close: Jan 29, 2026
Work includes Installation of approx. 15,500 LF of replacement 24", 30", 36", and 42" gravity sewer and associated replacement concrete and polymer concrete manholes. Installation of approx. 13,000 LF of CIPP structural liner in existing of 24", 30", 36" gravity sewer and epoxy lining of associated existing manholes. Abandonment of the existing 24" gravity sewer through lake dam. Installation of two pre-cast junction structures to maintain adequate flow splits in the creek sanitary sewer system. Installation of approx. 1,720 LF of stream stabilization measures. Removal and replacement of an existing greenway bridge and miscellaneous greenway improvements. See attached file.
AvailableWork includes sanitary sewer improvements project.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Work includes sanitary sewer improvements project.
Seeking proposals for the construction of a Water Distribution System, Sanitary Sewer System Improvements, and 37th Street Court & Storm Sewer Drainage Improvements to serve Whispering Creek Addition.
Posted Date
-
Due Date
Jan 2, 2026
Close: Jan 2, 2026
Seeking proposals for the construction of a Water Distribution System, Sanitary Sewer System Improvements, and 37th Street Court & Storm Sewer Drainage Improvements to serve Whispering Creek Addition.
AvailableInstallation of 6,530 LF of 30" dia. PVC gravity sewer pipe.
Posted Date
Nov 18, 2025
Due Date
Jan 9, 2026
Release: Nov 18, 2025
Close: Jan 9, 2026
Installation of 6,530 LF of 30" dia. PVC gravity sewer pipe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis