Description: PURPOSE AND BACKGROUND
The County of Imperial is soliciting quotations to remove existing R-35 insulation along with vinyl cover that has been damaged by water intrusion and replace it with spray closed cell foam insulation.
SCOPE OF WORK
Preparation & Protection
• Mask and cover all floors, open framing, windows, doors, mechanical equipment, and non-target surfaces within the work area to protect against overspray.
• All walls receiving spray foam must have one side of the stud cavities fully open and accessible to remove old insulation and apply new foam insulation.
• Remove and dispose of existing bagged batts insulation.
• Contractors will provide all necessary labor, tools, safety gear, respirators, fresh-air supply systems, and protective equipment for application technicians in accordance with OSHA and manufacturer standards.
• All mechanical, electrical, plumbing (MEP), and structural inspections must be completed and signed off prior to the start of insulation application.
Application & Specification
• Spray apply a closed-cell 2.0 lb. density foam to exposed interior walls and ceiling.
• Application to walls will be in controlled passes, within manufacturers specifications on exposed studs until target depth of Three inches (3”) is achieved on app. 1,700 sq. feet
• Spray apply foam directly to underside of clean roof deck, allowing adequate cool time between passes to build a continuous air and thermal seal to achieving target depth of Five inches (5”) on app. 5,000 sq feet
• Flush-trim overfilled foam in 2 x 6 wall stud cavities to allow proper sheetrock installation.
Cleanup & Job Completion
• Remove all protective polyethylene masking, tape, and overspray protection.
• Remove all job-related debris, foam scraps, and trash daily; leave the work area in broom-clean condition.