Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Hutchinson, Kansas issued an RFQ seeking Architectural and Engineering (A/E) services for the major rehabilitation or reconstruction of Runway 13-31 at Hutchinson Regional Airport (HUT). The selected consultant will provide full design, FAA/KDOT coordination, surveying, geotechnical investigations, preparation of PS&E, bidding assistance, and construction administration including QA/QC and environmental documentation. The solicitation was posted on 2025-12-08 with a response deadline of 2026-01-05 and an estimated value range of $2,000,000 - $5,000,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Premium
Access the largest public sector contact database
Close: Jan 5, 2026
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
AvailableThe reconstruction of runway 4-22 and redesign of runway 5-23, class seeding, 5,700 LF of install silt fence, 16 EA of catch basin inlet protection, 3 EA of replace existing retroreflective metal guidance sign panel on existing sign, 8 EA of remove existing runway threshold light & transformer & install cover on base, excavation to embankment, borrow excavation.
Posted Date
Nov 14, 2025
Due Date
Dec 11, 2025
Release: Nov 14, 2025
Close: Dec 11, 2025
The reconstruction of runway 4-22 and redesign of runway 5-23, class seeding, 5,700 LF of install silt fence, 16 EA of catch basin inlet protection, 3 EA of replace existing retroreflective metal guidance sign panel on existing sign, 8 EA of remove existing runway threshold light & transformer & install cover on base, excavation to embankment, borrow excavation.
Housing Major Rehab..
Posted Date
Nov 20, 2025
Due Date
Jan 9, 2026
Release: Nov 20, 2025
Close: Jan 9, 2026
Housing Major Rehab..
AvailablePerform a full reconstruction of Runway 10L-28R including lighting, striping, NVAIDS, and electrical includes 77,390 LF unclassified excavation, 90,840 SF new pavement markings with reflective beads, 1,080 LF install new 18" F679 PVC, 170 LF install new 24" steel casing, 10,190 LF D-705-5.2 6" Perforated PVC Underdrain Pipe, Complete, 9 EA install new manhole (type I), 6,550 LF L-110-5.4 1-2" Conduit, Schedule 40 PVC - Direct Buried, 11,180 LF L-110-5.5 1-2" Conduit, Schedule 40 PVC - CLSM. 660 LF L-110-5.25 1-2" Conduit, SDR 11 HDPE - Directionally bored Duct Bank, 1,200 LF S-142-5.5 3-#8, AWG, XHHW-2, 600V Wire (FAA).
Posted Date
Nov 14, 2025
Due Date
Dec 17, 2025
Release: Nov 14, 2025
Close: Dec 17, 2025
Perform a full reconstruction of Runway 10L-28R including lighting, striping, NVAIDS, and electrical includes 77,390 LF unclassified excavation, 90,840 SF new pavement markings with reflective beads, 1,080 LF install new 18" F679 PVC, 170 LF install new 24" steel casing, 10,190 LF D-705-5.2 6" Perforated PVC Underdrain Pipe, Complete, 9 EA install new manhole (type I), 6,550 LF L-110-5.4 1-2" Conduit, Schedule 40 PVC - Direct Buried, 11,180 LF L-110-5.5 1-2" Conduit, Schedule 40 PVC - CLSM. 660 LF L-110-5.25 1-2" Conduit, SDR 11 HDPE - Directionally bored Duct Bank, 1,200 LF S-142-5.5 3-#8, AWG, XHHW-2, 600V Wire (FAA).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis