Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Perform a full reconstruction of Runway 10L-28R including lighting, striping, NVAIDS, and electrical includes 77,390 LF unclassified excavation, 90,840 SF new pavement markings with reflective beads, 1,080 LF install new 18" F679 PVC, 170 LF install new 24" steel casing, 10,190 LF D-705-5.2 6" Perforated PVC Underdrain Pipe, Complete, 9 EA install new manhole (type I), 6,550 LF L-110-5.4 1-2" Conduit, Schedule 40 PVC - Direct Buried, 11,180 LF L-110-5.5 1-2" Conduit, Schedule 40 PVC - CLSM. 660 LF L-110-5.25 1-2" Conduit, SDR 11 HDPE - Directionally bored Duct Bank, 1,200 LF S-142-5.5 3-#8, AWG, XHHW-2, 600V Wire (FAA).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
Request for a single-project Architectural & Engineering team to provide full design, bidding, and construction-phase services for major rehabilitation or full reconstruction of Runway 13-31 at Hutchinson Regional Airport. Scope includes surveys, geotechnical and pavement design, airfield lighting/electrical and NAVAID coordination, CSPP/phasing, environmental/NEPA and permitting, PS&E and cost estimating, bidding support, construction administration/RPR and materials testing. Estimated construction cost: rehab ≈ $5,000,000; reconstruction ≈ $23,000,000. Project requires FAA AIP compliance, DBE participation, and experience with airport projects and FAA/KDOT coordination.
AvailableAirport runway plow vehicle.
Posted Date
Dec 9, 2025
Due Date
Jan 7, 2026
Release: Dec 9, 2025
Close: Jan 7, 2026
Airport runway plow vehicle.
AvailableThe DuPage Airport Authority issued an Invitation for Bid (IFB) for an Airport Runway Plow Vehicle to procure equipment for runway maintenance. The solicitation (IFB-2025-1207-0-2025/KK) was published via DemandStar on 2025-12-08 and includes a downloadable bid document/specifications available from the bid source. Bids are due January 7, 2026 at 2:30 PM Central (bid opening at 2:30 PM).
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
The DuPage Airport Authority issued an Invitation for Bid (IFB) for an Airport Runway Plow Vehicle to procure equipment for runway maintenance. The solicitation (IFB-2025-1207-0-2025/KK) was published via DemandStar on 2025-12-08 and includes a downloadable bid document/specifications available from the bid source. Bids are due January 7, 2026 at 2:30 PM Central (bid opening at 2:30 PM).
AvailableThe City of Hutchinson, Kansas issued an RFQ seeking Architectural and Engineering (A/E) services for the major rehabilitation or reconstruction of Runway 13-31 at Hutchinson Regional Airport (HUT). The selected consultant will provide full design, FAA/KDOT coordination, surveying, geotechnical investigations, preparation of PS&E, bidding assistance, and construction administration including QA/QC and environmental documentation. The solicitation was posted on 2025-12-08 with a response deadline of 2026-01-05 and an estimated value range of $2,000,000 - $5,000,000.
Posted Date
Dec 8, 2025
Due Date
Jan 5, 2026
Release: Dec 8, 2025
Close: Jan 5, 2026
The City of Hutchinson, Kansas issued an RFQ seeking Architectural and Engineering (A/E) services for the major rehabilitation or reconstruction of Runway 13-31 at Hutchinson Regional Airport (HUT). The selected consultant will provide full design, FAA/KDOT coordination, surveying, geotechnical investigations, preparation of PS&E, bidding assistance, and construction administration including QA/QC and environmental documentation. The solicitation was posted on 2025-12-08 with a response deadline of 2026-01-05 and an estimated value range of $2,000,000 - $5,000,000.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis