Summary
The successful contractor will clear and clean the drainage ditch back to its original parameters. Some projects will require a “snag & drag” approach to remove fallen trees and naturally occurring dams that restrict water flow. Other projects will require excavating leaf litter, debris and sedimentation to restore the original parameters of the ditch. This project is primarily a dredging operation. The existing structure provides drainage for State Route 649 Southside Road, and the surrounding area. The flow of water has been impeded by small trees, debris and some silt. The first part of the proposed maintenance dredging operation will start at State Route 649, approx. 50 LF south west of Crystal Beach Rd. and follow the contours of the existing ditch for approx. 1,725 LF and terminate at the point this ditch enters the T of the downstream ditch.