School DistrictMI
Posted
Nov 16, 2026
Dec 2, 2026
Orchard View Schools - Capital Project On a Design-Build Basis (Request for Proposals)
Capital project on a design-build basis.
Description: RFPQ FOR CAPITAL PROJECT ON A DESIGN-BUILD BASIS
SchoolDistrict · MI, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
252 days before RFP
ESG presented a district facilities plan and priority matrix for upgrades and maintenance at Cardinal and other Orchard View facilities, with a full-project estimate of $39 million to $53 million.
b. Terry and Paul from Energy System Group (ESG) went over a facilities plan that they have worked on with Tom Hamilton and Jack Timmer. We have talked about upgrades/maintenance the facilities will need-including OVEE, Cardinal, OVMS, OVHS, and OVCE. We had a facilities study done in 2016 and another in 2024. Terry and Paul shared the results of the ESG…
Orchard View Schools Board Of Education Working Session
Board meeting · Mar 9, 2026
Board meeting
56 days before RFP
Tom Hamilton reported that Orchard View was awarded an $8.8 million 12e grant for Cardinal Elementary roof and HVAC work and proposed developing a prioritized facilities plan.
III. PRESENTATIONS: a. Tom Hamilton, Superintendent, gave a facility needs overview and discussed some possible funding options. Seven years ago a facilities study was done. In 2023 the State of Michigan did one. Last year, another company did a facilities study. Through the 12e grant, we were awarded $8.8 million to spend on the roof and h-vac at Cardinal…
Board Of Education Orchard View Schools Regular Board Meeting
Board meeting · Sep 21, 2026
Board meeting
35 days before RFP
Tom Hamilton planned a timeline and facilities-review process for Cardinal Elementary HVAC upgrades, with PFM scheduled to present in November.
III. DISCUSSION a. Tom Hamilton, Superintendent, discussed a facilities committee. By Monday, 10/19, we can have a timeline for Cardinal Elementary H-Vac upgrades. At the Regular October meeting, Tom will present a few slides from our facilities studies. At the Regular November meeting, PFM will present. We will have our initial meeting within the next…
Orchard View Schools Board Of Education Committee Of The Whole Work Session
Board meeting · Oct 12, 2026
RFP published
Proposals due (13 days left)
Adjacent opportunities open for bidding right now.
School DistrictMI
Posted
Nov 16, 2026
Dec 2, 2026
Capital project on a design-build basis.
Coral Springs Improvement District
Special DistrictFL
Posted
Oct 19, 2026
Nov 20, 2026
DESIGN BUILD: Provide design and construction services in connection with water control system, water, wastewater and sewer systems, associated facilities, and related function.
CountyVA
Posted
Oct 30, 2026
Feb 9, 2027
Greene County is soliciting bids for the design and construction of the new Route 670 Connection and Route 29 auxiliary lanes. The work includes right-of-way acquisition, traffic signals, drainage, signing and pavement markings, stormwater management, a transportation management plan, erosion and sediment control, and utility relocations within the project limits. Drawings and additional documentation are available through a shared-drive link provided in Part 1 of the solicitation.
CountyVA
Posted
Oct 30, 2026
Feb 9, 2027
Greene County is soliciting bids for the design and construction of the new Route 670 Connection and Route 29 auxiliary lanes. The work includes right-of-way acquisition, traffic signals, drainage, signing and pavement markings, stormwater management, a transportation management plan, erosion and sediment control, and utility relocations within the project limits. Drawings and additional documentation are available through a shared-drive link provided in Part 1 of the solicitation.
Decision makers connected to this RFP from Orchard View School District.