The project consists of a two phased renovation of the interior and exterior of hangar 1050 including four separate interior admin spaces to better accommodate Marine Corps flight crews, equipment, and maintenance spaces for KC-130 and C-40 airframes. During renovation of Phase 1 spaces, aircraft maintenance operations will continue in Phase 2 areas. Similarly, when renovation continues into Phase 2 spaces, Phase 1 will be reoccupied and actively used for maintenance. Interior renovations encompass repair and replacement of all finishes, mechanical systems, plumbing, electrical, lighting, wet pipe fire suppression and fire alarm/mass notification systems. Exterior renovations include refinishing and repairing of the hangar doors and egress components and replacement of the hangar roof. Hangar bay renovation includes new electrical distribution, water distribution, waste water distribution, fire suppression, epoxy floor coating, compressed air system, heating and ventilation system and replacement of existing maintenance cranes and support railing.