Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Dolores School District RE-4A is soliciting sealed proposals to remove an existing Raypak boiler and install new Lochinvar high‑efficiency, modulating boilers serving the Commons area. The scope includes demolition/removal, installation of new boilers and associated systems, controls integration, commissioning, and a mandatory site walk. Issued January 23, 2026, proposals are due February 11, 2026.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
Posted Date
Jan 21, 2026
Due Date
Feb 2, 2026
Release: Jan 21, 2026
Close: Feb 2, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide installation of a new replacement boiler/burner unit. The project essentially consists of revised replacement of the existing failed boiler #2 at the site, with replacement of system piping elements as required to/from existing hydronic system points of connection. Work include demolition; equipment rigging; boiler installation; hydronic piping; domestic water piping; burner installation; fuel oil piping and specialties installation. See attached file.
Boiler replacement.
Posted Date
Jan 19, 2026
Due Date
Feb 13, 2026
Release: Jan 19, 2026
Close: Feb 13, 2026
Boiler replacement.
AvailableBoiler replacement.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Boiler replacement.
AvailableBoiler replacement.
Posted Date
Jan 5, 2026
Due Date
Feb 4, 2026
Release: Jan 5, 2026
Close: Feb 4, 2026
Boiler replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →