Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Montana Department of Transportation (MDT) requests proposals for preparation of construction plans and specifications to replace the bridge on West Broadway Street over Big Spring Creek in Lewistown, including minor roadway approach work. The consultant will provide comprehensive design services including investigation, analysis and design for bridge, roadway, geotechnical, hydraulic, environmental, survey, work zone safety and public involvement. The procurement will be evaluated on team qualifications, project approach, and past performance and the contract will be administered on a cost-plus fixed fee basis.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Montana DOT requests a consulting firm to prepare construction plans and specifications (PS&E) for replacement of Structure No. 04917 (bridge over Big Spring Creek on West Broadway Street, Lewistown). Required services include bridge and roadway design, geotechnical, hydraulic, environmental, survey, work‑zone safety/mobility, and public involvement; Montana professional engineering licensure required and the prime must perform ≥50% of the work.
Posted Date
Nov 25, 2025
Due Date
Dec 17, 2025
Release: Nov 25, 2025
Close: Dec 17, 2025
Montana DOT requests a consulting firm to prepare construction plans and specifications (PS&E) for replacement of Structure No. 04917 (bridge over Big Spring Creek on West Broadway Street, Lewistown). Required services include bridge and roadway design, geotechnical, hydraulic, environmental, survey, work‑zone safety/mobility, and public involvement; Montana professional engineering licensure required and the prime must perform ≥50% of the work.
AvailableThe work consists of creating an expansion of new park space within the Big Springs Park with concrete plazas, walls, a playground, seat walls, a pavilion and bathroom building, water features, public art walks (sidewalks), streetscape improvements as well as landscape and irrigation as well as all civil, architectural, and electrical associated with the project.
Posted Date
Nov 21, 2025
Due Date
Dec 16, 2025
Release: Nov 21, 2025
Close: Dec 16, 2025
The work consists of creating an expansion of new park space within the Big Springs Park with concrete plazas, walls, a playground, seat walls, a pavilion and bathroom building, water features, public art walks (sidewalks), streetscape improvements as well as landscape and irrigation as well as all civil, architectural, and electrical associated with the project.
AvailableWork includes repair and remediation of the hospital creek bridge.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
Close: Jan 27, 2026
Work includes repair and remediation of the hospital creek bridge.
AvailableProvide construction services for the liberty street creek restoration project.
Posted Date
Dec 2, 2025
Due Date
Dec 23, 2025
Release: Dec 2, 2025
Close: Dec 23, 2025
Provide construction services for the liberty street creek restoration project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis