Summary
Work includes removal and disposal of existing pavement 160.000 SY, removal of exist guardrail 550.000 LF, borrow excavation 1,296.000 CY, excavation for shoulder paving 7.392 sta, hauling of excavated shoulder material 7.392 sta, maintenance stone 56.500 Ton, cement modified recycled base (12" unif)-curing method b 86,492.000 SY, portland cement for cement modified recycled base course 3,374.000 Ton, hma shoulder widening course 49.280 Ton, liquid asphalt binder pg64-22 694.581 Ton, full depth asph pav patching 8" unif 650.000 SY, milling existing asphalt pavement 1.75" 11,088.000 SY, milling existing asphalt pavement (variable) 2,030.000 SY, asphalt surface course type c 10,259.974 Ton. See attached file.