Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide resilient rubber flooring tiles. Rubber Tiles with the following characteristics: ½” thickness minimum, 1 ½” thickness maximum. The flooring material shall be construction of a high-strength, impact-resistant hard rubber or polymer. Interlocking. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Department of the Air Force (Air Mobility Command) issued a Sources Sought notice for Resilient Rubber Flooring Tiles to provide interlocking, high-strength rubber/polymer tiles to cover approximately 10,000 square feet at Fairchild AFB. This market research effort aims to identify capable small businesses under NAICS 326199 and PSC 7220 to provide tiles with a thickness between 0.5 and 1.5 inches. Responses to this notice are due by February 3, 2026, and no contract award will be made directly from this posting.
Posted Date
Jan 27, 2026
Due Date
Feb 3, 2026
Release: Jan 27, 2026
Close: Feb 3, 2026
The Department of the Air Force (Air Mobility Command) issued a Sources Sought notice for Resilient Rubber Flooring Tiles to provide interlocking, high-strength rubber/polymer tiles to cover approximately 10,000 square feet at Fairchild AFB. This market research effort aims to identify capable small businesses under NAICS 326199 and PSC 7220 to provide tiles with a thickness between 0.5 and 1.5 inches. Responses to this notice are due by February 3, 2026, and no contract award will be made directly from this posting.
AvailableProvide modular walls to develop a modular teaching/training space for the 336 TRG SERE students. Panel Construction: At least Qty eighty-five (85) 4' x 7-10' light weight panels for walls and includes QTY eight (8) to fifteen (15) doors with half opening inward and half opening outward and QTY four (4) to twelve (12) windows. Panel Construction: At least Qty eighty-five (85) 4' x 7-10' light weight panels for walls and includes QTY eight (8) to fifteen (15) doors with half opening inward and half opening outward and QTY four (4) to twelve (12) windows. Windows are not required to open/close. See attached file.
Posted Date
Jan 29, 2026
Due Date
Feb 6, 2026
Release: Jan 29, 2026
Close: Feb 6, 2026
Provide modular walls to develop a modular teaching/training space for the 336 TRG SERE students. Panel Construction: At least Qty eighty-five (85) 4' x 7-10' light weight panels for walls and includes QTY eight (8) to fifteen (15) doors with half opening inward and half opening outward and QTY four (4) to twelve (12) windows. Panel Construction: At least Qty eighty-five (85) 4' x 7-10' light weight panels for walls and includes QTY eight (8) to fifteen (15) doors with half opening inward and half opening outward and QTY four (4) to twelve (12) windows. Windows are not required to open/close. See attached file.
AvailableProvide UTV/snow machine repair. The contractor is responsible for performing routine maintenance inspections and routine maintenance on UTVs and Snow machines.
Posted Date
Jan 29, 2026
Due Date
Feb 6, 2026
Release: Jan 29, 2026
Close: Feb 6, 2026
Provide UTV/snow machine repair. The contractor is responsible for performing routine maintenance inspections and routine maintenance on UTVs and Snow machines.
AvailableProvide removal and installation of vertical carousels.
Posted Date
Jan 8, 2026
Due Date
Feb 18, 2026
Release: Jan 8, 2026
Close: Feb 18, 2026
Provide removal and installation of vertical carousels.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis