Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lease one or two shore tanks located within the New York Harbor capable of storing ULSD up to 115,000 barrels.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of fuel tanks.
Posted Date
Nov 20, 2025
Due Date
Feb 3, 2026
Release: Nov 20, 2025
Close: Feb 3, 2026
Procurement of fuel tanks.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the painting of elevated tanks.
Posted Date
Jan 20, 2026
Due Date
Feb 13, 2026
Release: Jan 20, 2026
Close: Feb 13, 2026
Construction of the painting of elevated tanks.
AvailableA requirement for two 400 Gallon tanks to transport fish for release and to transport adult fish to hatcheries in full length pickup beds.
Posted Date
Jan 15, 2026
Due Date
Jan 28, 2026
Release: Jan 15, 2026
Close: Jan 28, 2026
A requirement for two 400 Gallon tanks to transport fish for release and to transport adult fish to hatcheries in full length pickup beds.
AvailableInstallation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
Installation of cathodic protection systems for the tank walls and tank floors. Cleaning, preparation, and lining of the interior of the reclamation water storage tanks, including all columns and piping within the tanks. Sealing of the roof to rim angle connection and the roof lap seams in the reclamation water storage tanks. Installation of grounding assemblies for each tank. Safety sign postage at each tank.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →