Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
U.S. Coast Guard
Procurement of fuel tanks.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
NAVFAC Mid-Atlantic
Replace fuel tanks and piping, building 4075.
Posted Date
Aug 18, 2025
Due Date
Dec 1, 2025
Release: Aug 18, 2025
NAVFAC Mid-Atlantic
Close: Dec 1, 2025
Replace fuel tanks and piping, building 4075.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Birmingham Airport Authority
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
Posted Date
Sep 29, 2025
Due Date
Dec 18, 2025
Release: Sep 29, 2025
Birmingham Airport Authority
Close: Dec 18, 2025
DESIGN BUILD. Design and construction under a Design-Build Contract for (i) three (3) 25,000 gallon Jet A fuel tanks at Fuel Farm B that will interconnect to the existing fuel farm system, and (ii) two (2) 25,000 gallon Jet A fuel tanks at Fuel Farm C that will operate as a separate fuel farm system (the “Project”) at the Birmingham Shuttleworth International Airport (the “Airport”).
AvailableRides Mass Transit District
Vendors to submit bids for up to eleven (11) 2,500 gallon capacity double-walled above ground storage tanks and equipment and up to nine (9) fuel canopy systems. This project will provide a safer, more comfortable user experience while enhancing our brand profile across our service area. The intent in soliciting bids is to obtain cost savings and to allow for a competitive process while maintaining an acceptable level of quality.
Posted Date
Oct 7, 2025
Due Date
Dec 5, 2025
Release: Oct 7, 2025
Rides Mass Transit District
Close: Dec 5, 2025
Vendors to submit bids for up to eleven (11) 2,500 gallon capacity double-walled above ground storage tanks and equipment and up to nine (9) fuel canopy systems. This project will provide a safer, more comfortable user experience while enhancing our brand profile across our service area. The intent in soliciting bids is to obtain cost savings and to allow for a competitive process while maintaining an acceptable level of quality.
AvailableSan Francisco International Airport
San Francisco Airport (Construction) is soliciting bids for as‑needed preventative maintenance, inspection, repair, and testing of generators, fuel tanks, ATS/load banks, and related fuel system components at SFO. The contract is locally funded, has a five‑year duration, and bids are due December 11, 2025 at 2:00 PM Pacific Time via the OpenGov portal.
Posted Date
Nov 6, 2025
Due Date
Dec 11, 2025
Release: Nov 6, 2025
San Francisco International Airport
Close: Dec 11, 2025
San Francisco Airport (Construction) is soliciting bids for as‑needed preventative maintenance, inspection, repair, and testing of generators, fuel tanks, ATS/load banks, and related fuel system components at SFO. The contract is locally funded, has a five‑year duration, and bids are due December 11, 2025 at 2:00 PM Pacific Time via the OpenGov portal.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →