Kankakee Valley School District
School DistrictIN
Posted
Nov 18, 2026
Jan 11, 2027
Request for Proposals -- Internal Connections 470 #270005128
Supply and install network switches and related transceivers at eligible locations.
Description: Monroe County Community School Corporation seeks proposals to supply network equipment and related services for internal connections at its eligible locations, as detailed in Appendix A (access points, brackets, gateways, switches, power supplies, cables and configuration support). Equipment must be new, factory-sealed with manufacturer warranties; installation services include staging, firmware/configuration, testing, documentation, and programming of four controllers, while no physical installation is required for access points. The project is contingent on successful Category 2 E-Rate funding and the contract must allow adjustment, scale-back, or cancellation based on funding availability.
SchoolDistrict · IN, US
Adjacent opportunities open for bidding right now.
Kankakee Valley School District
School DistrictIN
Posted
Nov 18, 2026
Jan 11, 2027
Supply and install network switches and related transceivers at eligible locations.
New Castle Community School District
School DistrictIN
Posted
Nov 17, 2026
Jan 7, 2027
New Castle Community School Corporation is procuring new, factory-sealed internal network equipment and associated installation at its eligible locations, including approximately 165 Ubiquiti UniFi U6 Enterprise access points and multiple UniFi switches (see Appendix A for quantities and part types). The scope requires staging, firmware/configuration consistency, installation replacing existing equipment, testing for internal and Internet access, and delivery of configuration and summary documentation; vendors must provide line-item pricing, warranties, certifications, references, an E-Rate SPIN, and a sample/ready-to-execute contract. Award and execution are contingent on successful Category 2 E-Rate funding, and the district reserves the right to adjust quantities, scale back, cancel the project, or reject bids as allowed by law.
School DistrictIN
Posted
Nov 17, 2026
Jan 4, 2027
Fremont Community Schools is soliciting proposals to supply eligible internal connections network equipment (as listed in Appendix A) for its locations, with no installation services requested. The contract is contingent on successful Category 2 E‑Rate funding and must allow the district to adjust quantities, scale back, or cancel the project based on funding availability. Equipment must be new, factory-sealed, include original manufacturer warranties, and bidders must itemize line‑level pricing and identify any ineligible costs or ongoing subscription pricing separately.
Whitley County Consolidated School District
School DistrictIN
Posted
Nov 20, 2026
Jan 8, 2027
Whitley County Consolidated Schools is procuring new, factory-sealed network equipment (switches, wireless access points, SFP transceivers, and associated licenses) and installation services for eligible locations as listed in Appendix A. The project is contingent on receiving Category 2 E-Rate funding and the contract must include E-Rate contingencies and permit quantity adjustments or cancellation based on funding availability. Vendor services must include staging, firmware/configuration loading, removal of existing equipment, installation, testing, documentation, and separate line-item pricing for equipment and installation.
Decision makers connected to this RFP from Monroe County Community School Corporation.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
581 days before RFP
MCCSC proposed a decade-long facilities project to upgrade safety and security systems, classrooms, site improvements, and technology, with maximum borrowing of $221.62 million.
Dr. Winston presented an overview of the educational needs and the project details, focused on the "Designing and Building to Sustain Excellence" initiative. She emphasized the significance of strong schools for the vitality of the commu- nity. In 2017, CSO Architects were hired to evaluate facility needs, the Board has revised the facility plans to improve…
Board Of School Trustees Preliminary Determination Hearing And Board Meeting
Board meeting · Apr 22, 2025
RFP published
Proposals due (46 days left)