Work includes 101 SY remove concrete pavement; 19 SY remove concrete gutter; 486 SY remove concrete driveways; 128 SY remove concrete sidewalk, ramp, steps, etc; 770 LF remove concrete (curb & gutter); 1,757 CY excavation includes removal of both asphaltic pavement and earthen materials; 785 SY remove trt/untrt base & asphalt pavement (driveways); 12 SY remove structures (brick driveways); 6 LF remove structures (pipe); 1 EA remove structures (inlet); 1 EA remove structures (headwall); 77 LF remove structures (handrail); 2 EA remove structures (fire hydrant). See attached file.