Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of plumbing materials for the United Nations Interim Security Force For Abyei (UNISFA).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Hanford Mission Integration Solutions, LLC (HMIS) is issuing an Expression of Interest (EOI) to assess the feasibility of a Warehouse Consolidation Facility Lease Agreement for the Hanford Site. The EOI seeks interested parties to provide approximately 250,000 square feet of contiguous warehouse space, 10,000 square feet of office space, and a 10+ acre lot in North Richland, Washington. Desired features include LEED certification, ENERGY STAR appliances, and electric car charging stations, with beneficial occupancy expected by October 1, 2028, for a 10-year base lease term.
Posted Date
Dec 11, 2025
Due Date
Jan 16, 2026
Release: Dec 11, 2025
Close: Jan 16, 2026
Hanford Mission Integration Solutions, LLC (HMIS) is issuing an Expression of Interest (EOI) to assess the feasibility of a Warehouse Consolidation Facility Lease Agreement for the Hanford Site. The EOI seeks interested parties to provide approximately 250,000 square feet of contiguous warehouse space, 10,000 square feet of office space, and a 10+ acre lot in North Richland, Washington. Desired features include LEED certification, ENERGY STAR appliances, and electric car charging stations, with beneficial occupancy expected by October 1, 2028, for a 10-year base lease term.
AvailableThe Department of Energy (Hanford Tank Waste Operations & Closure) issued a Sources Sought / Expression of Interest seeking Nuclear Safety Subject Matter Expert (SME) support for underground radioactive and hazardous waste tank operations at the Hanford site. The notice solicits expressions of interest to support nuclear safety documentation, operational compliance, and regulatory requirements for the Hanford Tank Waste Operations & Closure (H2C) program. The pre-solicitation was published on Dec 18, 2025 and the EOI response deadline is Jan 5, 2026; SAM.gov lists a Hanford website link for the current EOI and shows no attachments on SAM.gov.
Posted Date
Dec 18, 2025
Due Date
Jan 5, 2026
Release: Dec 18, 2025
Close: Jan 5, 2026
The Department of Energy (Hanford Tank Waste Operations & Closure) issued a Sources Sought / Expression of Interest seeking Nuclear Safety Subject Matter Expert (SME) support for underground radioactive and hazardous waste tank operations at the Hanford site. The notice solicits expressions of interest to support nuclear safety documentation, operational compliance, and regulatory requirements for the Hanford Tank Waste Operations & Closure (H2C) program. The pre-solicitation was published on Dec 18, 2025 and the EOI response deadline is Jan 5, 2026; SAM.gov lists a Hanford website link for the current EOI and shows no attachments on SAM.gov.
AvailableReplacement of the HVAC system. Removal of existing electrical support equipment, air handling unit, HVAC condensing units, ductwork, and associated refrigerant piping. Installation of new electrical support equipment. Installation of a 15-ton fan coil, 15-ton condensing unit, compressor, and associated refrigerant piping and controls.
Posted Date
Nov 19, 2025
Due Date
May 2, 2026
Release: Nov 19, 2025
Close: May 2, 2026
Replacement of the HVAC system. Removal of existing electrical support equipment, air handling unit, HVAC condensing units, ductwork, and associated refrigerant piping. Installation of new electrical support equipment. Installation of a 15-ton fan coil, 15-ton condensing unit, compressor, and associated refrigerant piping and controls.
AvailableProvide roof replacement services. Project includes removal of the existing blower, HEPA housing, skids, and capping of electrical and ducting on the Zone 1 roof. This project will require careful scheduling to avoid interference with previously scheduled training evolutions.
Posted Date
Dec 2, 2025
Due Date
Apr 2, 2026
Release: Dec 2, 2025
Close: Apr 2, 2026
Provide roof replacement services. Project includes removal of the existing blower, HEPA housing, skids, and capping of electrical and ducting on the Zone 1 roof. This project will require careful scheduling to avoid interference with previously scheduled training evolutions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis