Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the HVAC system. Removal of existing electrical support equipment, air handling unit, HVAC condensing units, ductwork, and associated refrigerant piping. Installation of new electrical support equipment. Installation of a 15-ton fan coil, 15-ton condensing unit, compressor, and associated refrigerant piping and controls.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement and upgrade of HVAC systems. Replace the existing steam boiler with an electric boiler. Install a global building controller to integrate with the site-wide network. See attached file.
Posted Date
Nov 19, 2025
Due Date
May 2, 2026
Release: Nov 19, 2025
Close: May 2, 2026
Replacement and upgrade of HVAC systems. Replace the existing steam boiler with an electric boiler. Install a global building controller to integrate with the site-wide network. See attached file.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide HVAC Replacement. Demolition and removal of the existing HVAC unit, conduit, piping, and support systems.
Posted Date
Nov 19, 2025
Due Date
May 2, 2026
Release: Nov 19, 2025
Close: May 2, 2026
Provide HVAC Replacement. Demolition and removal of the existing HVAC unit, conduit, piping, and support systems.
AvailableReplacement and upgrade of the parking lot and associated infrastructure.
Posted Date
Nov 19, 2025
Due Date
May 2, 2026
Release: Nov 19, 2025
Close: May 2, 2026
Replacement and upgrade of the parking lot and associated infrastructure.
AvailableProvide HVAC Upgrade. Removal of the existing fuel oil burner inside HV-AHU-1. Installation of an electric resistance heater in its place.
Posted Date
Nov 19, 2025
Due Date
May 2, 2026
Release: Nov 19, 2025
Close: May 2, 2026
Provide HVAC Upgrade. Removal of the existing fuel oil burner inside HV-AHU-1. Installation of an electric resistance heater in its place.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →