Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove and replace the two existing outboard motors and associated infrastructure on the 2005 25-ft. Research vessel seaark vc commander (anomaly ii).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Close: Jan 15, 2026
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Premium
Access the largest public sector contact database
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
Posted Date
Jan 24, 2022
Due Date
Jan 15, 2026
Release: Jan 24, 2022
Close: Jan 15, 2026
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
AvailableProvide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Provide motor pool fuel tank replacement. Remove the existing uconn motor pool fueling station, and deliver a fully operational fueling system comprised of two (2) 10,000 gallon underground storage tanks (USTs), one for gasoline and the other for diesel, associated piping, leak detection, stage i vapor recovery, electrical and controls, integration with current usage monitoring system, civil/site restoration, and turnover training.
AvailableProvide new panelboards and motor control center. The existing electrical equipment has met and exceeded its life expectancy and needs to be replaced with new. Disconnect all existing branch circuits and remove as called for in these contract documents. Provide new branch circuits from the new equipment as indicated.
Posted Date
Dec 1, 2025
Due Date
Jan 8, 2026
Release: Dec 1, 2025
Close: Jan 8, 2026
Provide new panelboards and motor control center. The existing electrical equipment has met and exceeded its life expectancy and needs to be replaced with new. Disconnect all existing branch circuits and remove as called for in these contract documents. Provide new branch circuits from the new equipment as indicated.