Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Gloucester County
Provide new panelboards and motor control center. The existing electrical equipment has met and exceeded its life expectancy and needs to be replaced with new. Disconnect all existing branch circuits and remove as called for in these contract documents. Provide new branch circuits from the new equipment as indicated.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Union Sanitary District
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
Posted Date
Nov 25, 2025
Due Date
Jan 15, 2026
Release: Nov 25, 2025
Union Sanitary District
Close: Jan 15, 2026
The project consists of Electrical power modification and replacement at Alvardo wastewater treatment plant. Replacement of existing 480V swithboard no 3. Replacement of 480V motor control center no 25. Re-feed of 480V power from SWBD-3
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Union Sanitary District
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
Posted Date
Jan 24, 2022
Due Date
Jan 15, 2026
Release: Jan 24, 2022
Union Sanitary District
Close: Jan 15, 2026
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
AvailableCoastal Water Authority
Provide services for the replacement of remote terminal unit (rtu) control panels at the east water purification plant (ewpp) pressure reduction station (prs) and the southeast water purification plant (sewpp) prs. Provide fabrication, programming, configuration, and integration of a new RTU Panel to replace the existing GEM80 and HSQ panels at EWPP PRS. This includes any new conduits and wiring needed for integration of the new RTU panel. Existing process instrumentation and I/O will remain.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Coastal Water Authority
Close: Dec 19, 2025
Provide services for the replacement of remote terminal unit (rtu) control panels at the east water purification plant (ewpp) pressure reduction station (prs) and the southeast water purification plant (sewpp) prs. Provide fabrication, programming, configuration, and integration of a new RTU Panel to replace the existing GEM80 and HSQ panels at EWPP PRS. This includes any new conduits and wiring needed for integration of the new RTU panel. Existing process instrumentation and I/O will remain.
AvailableIllinois Department of Corrections
Upgrade controls for four (4) Delta Control Panels. Upgrade the associated twenty-five (25) VAV’s to work with the upgraded panels. All work includes the labor and material for a complete and fully functional system that allows monitoring and control through the existing Delta Controls enteliWEB Graphical Interface.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Illinois Department of Corrections
Close: Dec 12, 2025
Upgrade controls for four (4) Delta Control Panels. Upgrade the associated twenty-five (25) VAV’s to work with the upgraded panels. All work includes the labor and material for a complete and fully functional system that allows monitoring and control through the existing Delta Controls enteliWEB Graphical Interface.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →