Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Coastal Water Authority
Provide services for the replacement of remote terminal unit (rtu) control panels at the east water purification plant (ewpp) pressure reduction station (prs) and the southeast water purification plant (sewpp) prs. Provide fabrication, programming, configuration, and integration of a new RTU Panel to replace the existing GEM80 and HSQ panels at EWPP PRS. This includes any new conduits and wiring needed for integration of the new RTU panel. Existing process instrumentation and I/O will remain.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Township of Macomb
Project consists of RTU replacement. See outside link.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
Township of Macomb
Close: Dec 10, 2025
Project consists of RTU replacement. See outside link.
AvailableSacramento Area Sewer District
Replacement of the existing irrigation control system. Replace the existing irrigation control system with a new, industry-recognized smart irrigation control system. The new system shall efficiently operate existing irrigation zones and components while enhancing water management, monitoring, and maintenance capabilities.
Posted Date
Oct 28, 2025
Due Date
Dec 2, 2025
Release: Oct 28, 2025
Sacramento Area Sewer District
Close: Dec 2, 2025
Replacement of the existing irrigation control system. Replace the existing irrigation control system with a new, industry-recognized smart irrigation control system. The new system shall efficiently operate existing irrigation zones and components while enhancing water management, monitoring, and maintenance capabilities.
AvailableCity of Norwalk
Work consists of replacement of the roof top units (RTU).
Posted Date
Oct 8, 2025
Due Date
Nov 18, 2025
Release: Oct 8, 2025
City of Norwalk
Close: Nov 18, 2025
Work consists of replacement of the roof top units (RTU).
U.S. Army Engineer District Huntington
Design-Build. Provide roof and RTU replacement. Building envelope, roof repair and replacement construction.
Posted Date
Oct 29, 2025
Due Date
Nov 20, 2025
Release: Oct 29, 2025
U.S. Army Engineer District Huntington
Close: Nov 20, 2025
Design-Build. Provide roof and RTU replacement. Building envelope, roof repair and replacement construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis