Retrieving RFP details
Release
Close
Sacramento Area Sewer District
Replacement of the existing irrigation control system. Replace the existing irrigation control system with a new, industry-recognized smart irrigation control system. The new system shall efficiently operate existing irrigation zones and components while enhancing water management, monitoring, and maintenance capabilities.
RFP8508-Irrigation-Control-System-Replacement
Blackhawk Technical College
Work includes to restore or replace the irrigation system.
Argo Community High School District
Provide and implement a district-wide telephone system replacement. The RFP outlines system requirements, installation scope, and ongoing support expectations. See attached file.
Wisconsin Department of Administration
In general, the work consists of: the replacement of existing sprinkler heads, nozzles, branch piping, valves and controller to bring system to commercial standards.
Release
Oct 28, 2025
Close
Dec 02, 2025