Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of water well pipe and pump. The pipe should be 3" sch 80 pipe and a total of 399'. The pump needs to be a 20 HP pump with motor and shroud that will pump at a rate of 150-175 GPM. We would like to send a camera down hole to look at the well casing and at the perforations. The well currently is 433' total depth and static water level is 271'.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide TCEC Well Water Pipe Replacement.
Posted Date
Dec 15, 2025
Due Date
Jan 22, 2026
Release: Dec 15, 2025
Close: Jan 22, 2026
Provide TCEC Well Water Pipe Replacement.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Sweetwater Authority is soliciting RFQual submittals for on-call water well and well pump maintenance covering removal and installation of pumps, appurtenance repair, pump and motor teardown/inspection and recommended repairs, well rehabilitation (physical/chemical cleaning), downhole video inspection, and emergency repair services for any of the Authority’s 13 wells. Agreements will be one-year with up to four annual renewal options (maximum five years), with work authorized by individual task orders and no guaranteed volume; selected firms must execute the Authority’s standard Agreement for Non-Professional Services and submit required forms and qualifications. Proposals are due on 2026-01-16 at 3:00 PM PST and are submitted electronically via the Authority’s vendor portal; primary solicitation documents are hosted on the buyer’s PlanetBids portal and may require registration to download.
Posted Date
Dec 19, 2025
Due Date
Jan 16, 2026
Release: Dec 19, 2025
Close: Jan 16, 2026
Sweetwater Authority is soliciting RFQual submittals for on-call water well and well pump maintenance covering removal and installation of pumps, appurtenance repair, pump and motor teardown/inspection and recommended repairs, well rehabilitation (physical/chemical cleaning), downhole video inspection, and emergency repair services for any of the Authority’s 13 wells. Agreements will be one-year with up to four annual renewal options (maximum five years), with work authorized by individual task orders and no guaranteed volume; selected firms must execute the Authority’s standard Agreement for Non-Professional Services and submit required forms and qualifications. Proposals are due on 2026-01-16 at 3:00 PM PST and are submitted electronically via the Authority’s vendor portal; primary solicitation documents are hosted on the buyer’s PlanetBids portal and may require registration to download.
AvailableThe Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
Posted Date
Dec 8, 2025
Due Date
Jan 14, 2026
Release: Dec 8, 2025
Close: Jan 14, 2026
The Project consists of site preparation and installation of a corrosion-proof polymer concrete precast wet well using the caisson method with tremie pour for the bottom seal. The scope includes clearing and grubbing the site, installing erosion and sedimentation controls, excavating for the wet well shaft, assembling and sealing wet well sections with retainer straps and watertight joints, pouring the tremie seal concrete, installing the secondary pour for the wet well bottom with chamfered edges, and conducting buoyancy calculations, watertightness testing, and backfilling.
AvailableReplacement of two storm water pumps and other associated work.
Posted Date
Dec 24, 2025
Due Date
Jan 27, 2026
Release: Dec 24, 2025
Close: Jan 27, 2026
Replacement of two storm water pumps and other associated work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →