Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the well pump assembly for the borough's production well 15. The work to be performed shall consist of the furnishing of all labor, equipment, materials and all else necessary to furnish and install a new deep well turbine pump and related equipment, including motor, bowl assembly, line shafting, bearings, riser column, and other miscellaneous and appurtenant items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes construction of water well pump replacement.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Work includes construction of water well pump replacement.
AvailableProvide water well redevelopment, pump and motor replacement.
Posted Date
Jan 12, 2026
Due Date
Jan 29, 2026
Release: Jan 12, 2026
Close: Jan 29, 2026
Provide water well redevelopment, pump and motor replacement.
AvailableThis RFP is for the construction of water well pump replacement in Yazoo County.
Posted Date
-
Due Date
Feb 10, 2026
Close: Feb 10, 2026
This RFP is for the construction of water well pump replacement in Yazoo County.
AvailableInspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Inspect and rehabilitate approx three (3) groundwater production wells and investigate/test pump one (1) groundwater production well. Work includes remove, inspect, and service motors and pumps, rehabilitate each well, equip each well with a pump and all other necessary equipment for flow testing (unless otherwise noted), maintain flow equipment during testing, and replace existing pump columns, if necessary. This work will also include flow testing two unequipped production wells.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis