Retrieving RFP details
Release
Close
Town of Windham
Replacement of the existing bridge with a steel superstructure, concrete deck with integral wearing surface, concrete abutments, replacing existing guardrails, approach work, and other incidental work.
Windham 26240
00 NTC
Fountain County Highway Dept.
The proposed construction will include existing bridge superstructure removal, installation of new steel i-beam superstructure, new reinforced concrete approach slabs, and guardrail. Additional work consists of conversion to semi-integral end bents, installation of new reinforced concrete approach slabs, and guardrail; and all incidental work required, as specified in the contract document and plans. Construction engineering; mobilization and demobilization; clearing right-of-way; present structure, remove portions, structure no; 24 CY excavation, common; 425 CY borrow; 4 CY sediment, remove; 910 LF filter sock; 861 SY manufactured surface protection product; 1 EA mobilization and demobilization for surface stabilization; 20 CY excavation, foundation, unclassified. See attached file.
Township of Washington
Bridge superstructure replacement.
Michigan Department of Technology, Management and Budget
Bridge rehabilitation including deck patching, replace hot mix asphalt wearing surface and approach work.
Release
Oct 29, 2025
Close
Nov 26, 2025