Summary
5172 lf hot applied painted pavement markings 4" yellow (temporary) price per linear footWork includes 900 CY, earth excavation (includes removal of asphalt pavement) price per cubic yard; 136 LF, cut bituminous concrete pavement; 150 LF, cofferdam and dewatering (sand bags); 275 CY, subbase (for temporary pavement); 400 LF, sedimentation control system; 67 TN, HMA S0.5 (for temporary pavement); 111 SY, milling of bituminous concrete (0" to 4"); 2 EA, remove drainage structure - 0' - 10' deep price for each; 121 LF, remove existing pipe - 0'-10' deep; 4290 SF, temporary earth retaining system; 220 LF, temporary traffic barrier (pinned); 840 LF, relocated temporary traffic barrier (pinned); 250 CY, removal of existing masonry; 30 day remote control changeable message sign; 5172 lf hot applied painted pavement markings 4" yellow (temporary). See attached file.