Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Install AUX 18,000 btu multi-zone HVAC systems in all 16 units of building C in KCDC's eastport 2 property, part of the five points property complex.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Knoxville’s Community Development Corporation (KCDC) is soliciting bids to replace HVAC units at its Eastport 2 property in Knoxville, TN. The project involves replacing apartment HVAC systems across four buildings, totaling approximately 60 units, and includes necessary electrical and structural modifications. Bids are being accepted through the BidNet Direct platform until the closing deadline in February 2026.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
Knoxville’s Community Development Corporation (KCDC) is soliciting bids to replace HVAC units at its Eastport 2 property in Knoxville, TN. The project involves replacing apartment HVAC systems across four buildings, totaling approximately 60 units, and includes necessary electrical and structural modifications. Bids are being accepted through the BidNet Direct platform until the closing deadline in February 2026.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
Posted Date
Dec 11, 2025
Due Date
Feb 12, 2026
Release: Dec 11, 2025
Close: Feb 12, 2026
This project includes the replacement of steam and chilled water coils in multiple existing air handler units (AHU) and associated duct revisions on level 9 at George Allen Courthouse. Also, the replacement of one air handler unit (AHU) and combining two existing air handler units into one unit located at basement level B1.
AvailableWork includes demolition and disposal of three existing rooftop HVAC units and installation of Owner-furnished Contractor-installed Trane HVAC units including all new rooftop ductwork, isolation system, roof repair, bracing and framing. Work also includes removal and replacement of all interior VAV units including associated ceiling removal and replacement, flex duct replacement at supply and returns, piping and valves as shown in the bid plans and specifications.
Posted Date
Dec 29, 2025
Due Date
Jan 27, 2026
Release: Dec 29, 2025
Close: Jan 27, 2026
Work includes demolition and disposal of three existing rooftop HVAC units and installation of Owner-furnished Contractor-installed Trane HVAC units including all new rooftop ductwork, isolation system, roof repair, bracing and framing. Work also includes removal and replacement of all interior VAV units including associated ceiling removal and replacement, flex duct replacement at supply and returns, piping and valves as shown in the bid plans and specifications.
AvailableHvac replacement
Posted Date
Nov 25, 2025
Due Date
Jan 27, 2026
Release: Nov 25, 2025
Close: Jan 27, 2026
Hvac replacement
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →