Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide the removal of an existing railroad flat car bridge and construction of a new prefabricated steel bridge at the same location. The project includes demolition, site development, foundation construction, bridge installation, erosion control, and full site restoration in accordance with the project plans and specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailablePremium
Access the largest public sector contact database
Work includes demolition and replacement of existing heavy timber trestle bridge.
Posted Date
Dec 1, 2025
Due Date
Dec 22, 2025
Release: Dec 1, 2025
Close: Dec 22, 2025
Work includes demolition and replacement of existing heavy timber trestle bridge.
Available1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
Posted Date
Oct 23, 2025
Due Date
Jan 6, 2026
Release: Oct 23, 2025
Close: Jan 6, 2026
1 LS Remove Existing Bridge, Pilings and Logs. 1 LS Furnish and Install New Bridge System. 780 LF 8" Steel Piling 5 CY Excavation Channel and Pond 450 SF 6" 8" Concrete Walk. 120 LF Flotation Silt Curtain Type Moving Water. 1 LS Turf Establishment The provisions of MINN. STAT. 16C.285 Responsible Contractor are imposed as a requirement of this contract.
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis