Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Federal Bureau of Prisons (BOP) Field Acquisition Office issued a presolicitation for a firm fixed-price construction contract to replace and upgrade the SCP gas line at Federal Correctional Institution (FCI) La Tuna in Anthony, TX. The work includes furnishing all equipment, materials, and labor with a performance period of 260 calendar days and an estimated magnitude between $100,000 and $250,000; it is a 100% small business set-aside under NAICS 237120. The solicitation will be posted and distributed solely through SAM.gov (solicitation expected approximately on or about 2026-01-07) and the presolicitation was posted 2025-12-12 with a response deadline of 2025-12-29 5:00 p.m. EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace boilers & controls. Replace the original boilers and controls, provide delivery, startup and testing of specific identified boilers. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Replace boilers & controls. Replace the original boilers and controls, provide delivery, startup and testing of specific identified boilers. This project would involve draining the system, removing existing boiler, removing hot water supply and return piping as required, disconnecting existing main power and gas piping, provide and install new Aldrich or like boiler, removing existing expansion tanks and providing and installing new expansion tank, provide and install new hot water supply and return piping as required by installation, provide and install new boiler pump, provide and install new low water cutoffs and safeties, provide and install new flew connections as required, reconnect existing main power wiring and gas piping, and provide startup and testing.
AvailableReplace Roofs FCI 1 & SPC at the Federal Prison Camp. Replacing approx. 47,000 SF. of ceiling, 1,000 sq. ft. of skylights with associated framing, 115,000 sq. ft. of standing seam metal roofing, 30,200 sq. ft. of modified bituminous roofing, and 141,000 SF. of exposed fastener metal roofing systems.
Posted Date
Dec 1, 2025
Due Date
Feb 11, 2026
Release: Dec 1, 2025
Close: Feb 11, 2026
Replace Roofs FCI 1 & SPC at the Federal Prison Camp. Replacing approx. 47,000 SF. of ceiling, 1,000 sq. ft. of skylights with associated framing, 115,000 sq. ft. of standing seam metal roofing, 30,200 sq. ft. of modified bituminous roofing, and 141,000 SF. of exposed fastener metal roofing systems.
AvailableThe Federal Bureau of Prisons (BOP) issued Solicitation 15BBNF26B00000007 for a firm-fixed-price construction contract to replace boilers and controllers at FCI Pekin in Pekin, IL. The scope includes removal of existing boilers and piping, installation of a new Aldrich or equivalent boiler, new expansion tanks, pumps, low-water safeties, flue connections, and verification of communication with existing Siemens systems, plus startup, testing, and removal/disposal of old equipment. This is a 100% small business set-aside under NAICS 238220 with an estimated value range of $1,000,000–$5,000,000 and electronic submission instructions provided via JEFS Box on SAM.gov.
Posted Date
Jan 7, 2026
Due Date
Feb 11, 2026
Release: Jan 7, 2026
Close: Feb 11, 2026
The Federal Bureau of Prisons (BOP) issued Solicitation 15BBNF26B00000007 for a firm-fixed-price construction contract to replace boilers and controllers at FCI Pekin in Pekin, IL. The scope includes removal of existing boilers and piping, installation of a new Aldrich or equivalent boiler, new expansion tanks, pumps, low-water safeties, flue connections, and verification of communication with existing Siemens systems, plus startup, testing, and removal/disposal of old equipment. This is a 100% small business set-aside under NAICS 238220 with an estimated value range of $1,000,000–$5,000,000 and electronic submission instructions provided via JEFS Box on SAM.gov.
Replace high mast light. The Federal Correctional Institution (FCI) Marion has a con-struction requirement for replacing one (1) 100' Carolina orequivalent high mast pole including new cables, wires, andLED fixtures. The contractor will remove and dispose of theexisting 100' pole and lighting fixture.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Replace high mast light. The Federal Correctional Institution (FCI) Marion has a con-struction requirement for replacing one (1) 100' Carolina orequivalent high mast pole including new cables, wires, andLED fixtures. The contractor will remove and dispose of theexisting 100' pole and lighting fixture.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis